• Client: Australian independent restaurant owner in Melbourne (anonymous upon request)
• Industry: Independent restaurant / Second location opening
• Location: Melbourne, Australia
• Order: Approx. 30 dining tables + 80 dining chairs + 10 bar tables + 20 bar stools, approx. 140–150 pieces
• AEONTI Customization: Dark walnut tabletop, black powder-coated metal legs, size and packaging customization
• Completed Locally by Client: Chair-back brand logo laser-engraved by a local Melbourne shop
• Core Challenge: Custom color pushed supplier MOQ to 500 pcs or added a USD 1,200 setup fee plus 28% surcharge; full-container rule rejected 150-pc orders; standard lead time was 60–75 days door-to-door, but the opening was only about 9 weeks away
• AEONTI Solution: Modular table legs + universal frames + mixed container loading + sample approval + stable 30-day production
• Result: Production completed and shipped 30 days after sample approval, 18 days expedited ocean freight, approx. 58 days door-to-door, approx. 18% lower cost than local sourcing, on-time opening, 120 additional pieces reordered for the second store 3 months later