Shenzhen Chain Restaurant Group: 12,000 Custom Table Legs Delivered in 90 Days for 45 Locations

Shenzhen Chain Restaurant Group: 12,000 Custom Table Legs Delivered in 90 Days for 45 Locations

Summary

A Shenzhen restaurant chain with 45 China locations needed 12,000 custom table legs for a dining room renovation. The project required engineering-grade solutions to withstand 16-hour daily use. AEONTI delivered in 90 days via split-order production and urgent replenishment. The operations team reported zero installation issues and consistent quality across all locations. Completed on time and under budget, the project led to a long-term supply agreement for future store openings.

The Challenge

Hotpot Hero, a fast-growing Chinese hotpot chain, was rolling out a complete dining room renovation across all 45 locations. The new design featured custom table systems with a specific aesthetic: matte black powder-coated table legs paired with sintered stone tabletops.

The challenge was immense. Twelve thousand table legs were needed—enough to furnish over 2,000 tables. Each leg had to meet strict engineering specifications: minimum load capacity, weld quality standards, and exact finish matching across all batches. The timeline was 90 days.

"We had tried other suppliers for smaller projects and always ended up with quality inconsistencies between batches," the project manager said. "For a project this scale, inconsistency would be a disaster."

The Solution

AEONTI deployed a project-specific solution built around engineering-grade structural and load-bearing capabilities:

Engineering-grade design: Each table leg engineered for 16-hour daily use with minimum 100kg load capacity

Split-order production: Production divided into four waves to maintain quality control and allow phased delivery

Urgent replenishment: Dedicated production line capacity for emergency reorders

Batch consistency protocol: Every batch matched against a master sample with photographic documentation

The project team at AEONTI worked directly with Hotpot Hero's design and operations teams to ensure every specification was met—from weld quality to powder coat thickness.

The Results

All 12,000 table legs were delivered within the 90-day window:

100% installation success: Zero defective units reported across all 45 locations

Consistent quality: Every batch matched the master sample exactly

On-time completion: Final delivery made 5 days before the renovation deadline

Long-term agreement: Hotpot Hero signed AEONTI as exclusive table leg supplier for all future locations

"This was the smoothest large-scale project we've ever managed," the project manager confirmed. "AEONTI delivered exactly what they promised—on time and to specification."
📧aeonti@aeonti.com 
🌐 www.aeonti.com